ActivitiesPerson Responsible
Engineering Activities
[ ] Create install and configuration scripts as needed. Bill Hess
[ ] Remove debugging and testing code from the software (including disabling assertions).Bill Hess
[ ] Create the releasable software media (CD-ROM, downloadable JAR file, etc) required by customer.Bill Hess
Quality Assurance Activities
[ ] Verify all source code meets coding standard; run Checkstyle or other style-checker and do manual inspection.Brian Mark
[ ] Check that all defects on current defect list have been resolvedJim Strange
[ ] Smoke test/regression test final buildJim Strange
[ ] Verify that every test in the Test Matrix appears in the Test Script.Jim Strange
[ ] Verify all unit tests run automatically on the current build. *Jim Strange
[ ] Verify all system test scripts run automatically on the actual released software. *Jim Strange
[ ] Perform all non-functional system tests manually and document results. *Jim Strange
[ ] Verify installation by installing system on clean machine.Jim Strange
[ ] Have someone not on your team install and run your system without assistance by following your installation directions.Jim Strange
[ ] Install program on machine with older version of program (upgrade install) Jim Strange
[ ] Verify all steps in the deployment plan are completed.Brian Mark
[ ] Consistency check: SRS, User Manual, System Tests, Staged Delivery Plan, and Software must all match!Terence Statt
Release Activities
[ ] Produce hardcopy of empirical evidence that the release criteria have been met.*Release team
[ ] Schedule Acceptance Test date with customer (and instructor). *Release team
[ ] Virus scan all release mediaRelease team
[ ] Tag and Branch the source code repository. *Change Control team
Documentation Activities
[ ] Verify that User Documentation matches current Release.Terence Statt
[ ] Create a "ReadMe" text file with installation instructions.Terence Statt
[ ] Write "Known Issues" List.Terence Statt
Other Activities
[ ] Project Visiblity Calculations are current and accurate.Jamie Ray
[ ] Create draft features list for next Staged Delivery Plan.Jamie Ray
[ ] Schedule Project Survival Assessment or Post-Mortem meeting.Jamie Ray