Software Release Criteria
- [x] Automated Functional System Tests for all features in the Staged Delivery Plan are passing. May be manual instead of automated for Stage 1, Spring 2008.
- [x] At least 80% of System Tests for non-functional requirements in the SRS are passing.
- [x] Actual code complete is at least 90% of planned.
- [x] The slope of the code growth curve for the week prior to release must be less than 25%. (Based on data from daily build reports).
- [ ] Automated coding style checker reports each class has less than 2 violations per 100 LOC.
- [x] At least 90% of binary miniature milestones (action items) are complete.
- [x] There are no severity 1 open defects.
- [x] The number of defects reported must be at least 80% of predicted.
- [x] 75% of all severity 2 reported defects must have been fixed.
- [x] The slope of the defects reported curve for the five days prior to release must be less than 30%.
Explanation of any items not checked goes here.