Luna Team Meeting Notes - 5/29/08
Notes:
- Close ALL POSSIBLE tickets by Sunday
- ANYTHING required for job, have done by saturday
- check release checklist
- daily builds
- check release checklist
- FINAL QA MEETING SUNDAY
- where/when - meet in the csl 2pm
- get basis path testing paperwork and inspections paperwork to stephanie/ian by saturday/sunday if coming to QA
- RELEASE MONDAY 7pm in lab
- microschedule
- thursday
- have basis path testing done
- Richard run emma - email results to Steph
- last minute changes to code
- fixup user manual
- write tests which are past due (system test scripts/unit tests)
- friday
- testing to satisfy coverage requirement
- defect fixing and testing - follow procedure
- fixup user manual
- write tests which are past due (system test scripts/unit tests)
- saturday
- testing to satisfy coverage requirement
- defect fixing and testing - follow procedure
- user manual done
- write tests which are past due (system test scripts/unit tests)
- sunday
- close tickets
- Final QA meeting - CSL 2pm
- monday - release meeting - 7pm
- thursday
- post-integration
- everything went pretty well
- few defects will be fixed asap
- change request
- layout for prefrence panel - too new for 1.6
- requirement says 1.5 or higher
- change to 1.6 or higher
- mark submit change request/ tracy change
- assign defects
- assigned 394 to long
- assigned 395 to istewart
Tasks:
Stephanie
- make tickets
- what to bring to qa meeting
- release checklist tickets
- Email UM changes to Tracy
- section for text box
- fix script system test for stage 2
- post meeting minutes and wsr
- complete basis path testings
- add announcement for release meeting and QA meeting
- send email of microschedule
- add defect for having to add mypanels to pauls panels for integration
Mark
- submit change request for 1.6 version
- complete basis path testings
- System Test - make a manual test and then script it, add test to the cases page and update the history, then email to richard and create script
Tracy
- fix srs for change request
- complete basis path testings
- user manual fixing
Ian
- complete basis path testings
Richard
- use emma to test our testsuite... send stephanie results by friday so we can make the requirement for % of tests coverage
- complete basis path testings
Paul
- update daily builds on wiki
- javadocs for added jalopy classes/changestyle classes
- complete basis path testings
Luna Team Meeting Notes - 5/22/08
Notes:
- TESTING, CODING, TESTING, TESTING
- NEXT TWO WEEKS
- system tests
- scripts
- unit tests
- basis path tests
- integration tests
- not til code and unit tests written
- integration tests
- system tests
- NEXT TWO WEEKS
- IF YOU CANNOT COMPLETE A TICKET ON TIME; EMAIL STEPHANIE REASONS AND THE DATE YOU WOULD LIKE THE DUE DATE
TO BE EXTENDED
- Inspections - due by Friday
- Tracy - Richard - Paul
- Stephanie - Ian - Mark
- INTEGRATION
Tasks:
Stephanie
- make tickets
- Email UM changes to Tracy
- section for text box
- script system test for stage 2
- UNIT Tests are PASTDUE - complete ASAP
- Complete inspections send results to author
- email richard about test case change
Mark
- approve change request for removal of req.
- script system test for stage 2
- UNIT Tests are PASTDUE - complete ASAP
- Complete inspections send results to author
Tracy
- update User Maunal
- script system test for stage 2
- UNIT Tests are PASTDUE - complete ASAP
- Complete inspections send results to author
- email richard about test case change
- update staged delivery plan
- req 1, will link to jalopy um if there is an existing section
- tag html code for header/footer and email to paul
Ian
- SYSTEM test case PASTDUE
- post on test cases page and email copy to richard
- script system test for stage 2
- UNIT Tests are PASTDUE - complete ASAP
- Complete inspections send results to author
Richard
- SYSTEM test case PASTDUE
- post on test cases page
- UNIT Tests are PASTDUE - complete ASAP
- Complete inspections send results to author
- add column to test case result matrix to specify when the last time the tests were run
Paul
- Complete inspections send results to author
- System tests need to be automated with scripts - if can't let Richard know ASAP
- create integration plan
- script system test for stage 2
- for footer/header section, link to ChangeStyle UM not Jalopy
Luna Team Meeting Notes - 5/20/08
Notes:
- TESTING, CODING, TESTING, TESTING
- NEXT TWO WEEKS
- system tests
- scripts
- unit tests
- basis path tests - starts thursday
- coverage tests
- integration tests
- not til code and unit tests written
- integration tests
- system tests
- NEXT TWO WEEKS
- IF YOU CANNOT COMPLETE A TICKET ON TIME; EMAIL STEPHANIE REASONS AND THE DATE YOU WOULD LIKE THE DUE DATE
TO BE EXTENDED
- Inspection teams
- Tracy - Richard - Paul
- Stephanie - Ian - Mark
- CLOSE TICKETS AS SOON AS COMPLETED
- BASIS TESTING MODULES :
- Stephanie - HeaderSettingsPage?
- Ian – your requirement code
- Paul – Format Action.java’s actionPerformed method
- Richard – ChangeStyleMenu?.java’s isUndoable method
- Mark – ChangeStyleMenu?.java’s getClassMenuItem method
- Tracy – ChangeStylePref?.java’s actionPerformed method
Tasks:
Stephanie
- make tickets
- post wsr
- add scripts to schedule and daily build complete
- UNIT Tests are PASTDUE - complete ASAP
- CODE DUE WED - do not COMMIT
- Complete inspections send results to author
- System tests need to be automated with scripts - if can't let Richard know ASAP
- Basis Path Tests
Mark
- approve change request for removal of req.
- SYSTEM test case PASTDUE
- post on test cases page and email copy to richard
- need to be automated with scripts - if can't let Richard know ASAP
- UNIT Tests are PASTDUE - complete ASAP
- CODE DUE WED - do not COMMIT
- Complete inspections send results to author
- Basis Path Tests
Tracy
- remove requirement 3.0.11 from the SRS as per change request
- SYSTEM test case PASTDUE
- post on test cases page and email copy to richard
- need to be automated with scripts - if can't let Richard know ASAP
- need to be automated with scripts - if can't let Richard know ASAP
- UNIT Tests are PASTDUE - complete ASAP
- CODE DUE WED - do not COMMIT
- Complete inspections send results to author
- send html links to paul
- change richards req (4)
- Basis Path Tests
Ian
- SYSTEM test case PASTDUE
- post on test cases page and email copy to richard
- need to be automated with scripts - if can't let Richard know ASAP
- UNIT Tests are PASTDUE - complete ASAP
- CODE DUE WED - do not COMMIT
- Complete inspections send results to author
- Basis Path Tests
Richard
- add paul's stage 2 test to test matrix
- SYSTEM test case PASTDUE
- post on test cases page
- need to be automated with scripts - if can't let Richard know ASAP
- post on test cases page
- UNIT Tests are PASTDUE - complete ASAP
- CODE DUE WED - do not COMMIT
- Complete inspections send results to author
- Basis Path Tests
Paul
- UNIT Tests are PASTDUE - complete ASAP
- CODE DUE WED - do not COMMIT
- Complete inspections send results to author
- System tests need to be automated with scripts - if can't let Richard know ASAP
- create integration plan
- Basis Path Tests
- Fix test case 11 to say a no defects between a certain number of formats (like 30) instead of four hours between defects
Luna Team Meeting Notes - 5/15/08
Notes:
- Next Thursday - status update...
- make sure visibility cals are updated and current on the wiki
- update risks
- release maintenance work Stage 1.1
- Update risks
- Tool issues like costello
- lack of sleep will lower quality
- Lack of customer communication (awaiting response for long period of time)
- Add new system tests to wiki
- add to system test cases page
- email number, case, etc. to Richard
- richard will link everything else
- CLOSE ALL TICKETS THAT ARE POSSIBLE TO CLOS
- For Tuesday
- All Unit Tests and System tests for stage 1.1
- release page updated - release notes
- schedule updated and concrete
- make sure wiki is all connected
Tasks:
Stephanie
- system giu test for xml naming convention - due Sunday
- fix schedule
- add new section for maintenance release - Rename to Stage 1.1
- auto-daily build LATE
- add new section for maintenance release - Rename to Stage 1.1
- clarity for headers and footers
- put text box in delete area
- we don't want to allow for deletion of headers
- UNIT Tests AND SYSTEM TESTS for Stage 2 requirement(s) - Due SATURDAY
- Begin coding for Stage 2 requirement(s) - DUE Wed.
- update visibility calcs
- unit tests need to be updated (LINK)
Mark
- Finish up status of change request for req. 5 removal
- UNIT Tests AND SYSTEM TESTS for Stage 2 requirement(s) - Due SATURDAY
- Begin coding for Stage 2 requirement(s) - DUE Wed.
- HOURS REPORT
Tracy
- maintanence req. 4 - due 5/20
- Write User Manual Conventions section
- write updates to the User Manual for requirement 9 by 5/13
- Change request for user manual for stage 1.1
- change unit test for old homework into .java from .txt
- UNIT Tests AND SYSTEM TESTS for Stage 2 requirement(s) - Due SATURDAY
- Begin coding for Stage 2 requirement(s) - DUE Wed.
- HOURS REPORT
- release notes for 1.1
- defect for batch undo in the SRS
Ian
- maintenance req.3 - due 5/15
- write udates to the User Manual for requirements 2/6 and submit to Tracy by 5/13 (waiting for customer response)
- UNIT Tests AND SYSTEM TESTS for Stage 2 requirement(s) - Due SATURDAY
- Begin coding for Stage 2 requirement(s) - DUE Wed.
- HOURS REPORT
- post QA Plan on wiki
Richard
- write updates to the User Manual for requirements 3/4 and submit to Tracy by 5/13 LATE
- Complete EMMA coverage testing tutorial (in test plan)
- runs all Stage 1.0 tests on maintenance - Sunday/Monday
- make sure all tests (system and unit) pass for Stage 1.1
- get ready for 1.1 release
- UNIT Tests AND SYSTEM TESTS for Stage 2 requirement(s) - Due SATURDAY
- Begin coding for Stage 2 requirement(s) - DUE Wed.
- HOURS REPORT
Paul
- automated Daily Build LATE
- maintenance req. 2 - due 5/15 LATE
- write updates to the User Manual for requirement 1 and submit to Tracy by 5/13 LATE
- system tests and unit tests for maintenance work - due Sunday
- UNIT Tests AND SYSTEM TESTS for Stage 2 requirement(s) - Due SATURDAY
- Begin coding for Stage 2 requirement(s) - DUE Wed.
- HOURS REPORT
Luna Team Meeting Notes - 5/8/08
Notes:
- decide repository
- modify schedule
- Unit Tests due Saturday instead of Thrusday
- Coding Sunday thru Wednesday by like 9pm (since inspections on Thursday)
Tasks:
Stephanie
- old wsr ant todays notes - post
- make tickets
- write updates to the User Manual for requirement 7 and submit to Tracy
- send Ian what needs to be changed for test case 22
- update schedule
- system giu test for xml naming convention - due Sunday
Mark
- Finish up status of change request for req. 5 removal
- write updates to the User Manual for requirement 8 and submit to Tracy by 5/13
- Finish repository rework
Tracy
- maintanence req. 4 - due 5/15
- Write User Manual Conventions section
- write updates to the User Manual for requirement 9 by 5/13
- Change request for user manual for stage 1.1
- change unit test for old homework into .java from .txt
Ian
- procedure rewrite for test case 22
- maintenance req.3 - due 5/15
- write udates to the User Manual for requirements 2/6 and submit to Tracy by 5/13
- write universal BClass stub for unit testing - waiting for repository
Richard
- write updates to the User Manual for requirements 3/4 and submit to Tracy by 5/13
- Complete EMMA coverage testing tutorial (in test plan)
- prototype for undo dialog
- work on automating system tests
Paul
- automated Daily Build
- Tues - 5/13
- maintenance req. 2 - due 5/15
- figure out what needed for requirement
- write updates to the User Manual for requirement 1 and submit to Tracy by 5/13
- system tests and unit tests for maintenance work - due Sunday
Luna Team Meeting Notes - 5/8/08
Notes:
- FOLLOW THE DEFECT PROCEDURE
- Testing Cycle
- Unit Test (white box)
- Coding
- Integration Testing (white box)
- System Testing (black box)
- Acceptance Testing
- System test/unit test case for maintenance work
- Schedule Revisions:
- Unit Testing by Thursday 15th
- Coding start Friday 16th done by 21st
- Inspections Tues 22nd
- Integration 23rd - 27th
- System Tests 23rd - 27th
- Basis Path Testing (next week - release)
- coverage testing (next week - release)
- EACH PERSON NEEDS TO WRITE SYSTEM TEST CASES AND SCRIPTS, UNIT TEST CASES FOR THEIR NEW REQUIREMENTS
- EVERYONE NEEDS TO REDO THE ASSIGNMENT DUE TUES
Tasks:
Stephanie
- rewrite schedule
- old wsr
- make tickets
- maintanence req. 4 - due 5/15
- send tracy xml convention summary
- figure out what needed for requirement
- write updates to the User Manual for requirement 7 and submit to Tracy
Mark
- SET COMPONENT FIELDS ON TRAC - due ASAP (LATE)
- can change through wiki under admin page
- change severity fields
- change request for removal of req. 5
- send tracy xml convention summary
- fix branching
- figure out what needed for requirement
- write updates to the User Manual for requirement 8 and submit to Tracy by 5/13
- New section on Release Page for Maintenance work (Stage 1.1)
- HW ASSIGNMENT BY SAT
Tracy
- add requirements to SRS
- switch up staged delivery plan
- maintanence req. 4 - due 5/15
- Write User Manual Conventions section
- figure out what needed for requirement
- write updates to the User Manual for requirement 9 by 5/13
- Change request for User Manual
Ian
- procedure rewrite for test case 22
- maintenance req.3 - due 5/15
- figure out what needed for requirement
- write udates to the User Manual for requirements 2/6 and submit to Tracy by 5/13
- write universal BClass stub for unit testing
Richard
- req. 8 feasibility Due THURSDAY
- prototype editing
- figure out what needed for requirement
- write updates to the User Manual for requirements 3/4 and submit to Tracy by 5/13
- Complete EMMA coverage testing tutorial (in test plan)
- make system test scripts for last releases functional system test cases (cases you did)
Paul
- automated Daily Build
- Tues - 5/13
- maintenance req. 2 - due 5/15
- figure out what needed for requirement
- write updates to the User Manual for requirement 1 and submit to Tracy by 5/13
- System test case/unit test case for maintenance work (button, is there and clickable)
Luna Team Meeting Notes - 5/6/08
Notes:
- FOLLOW THE DEFECT PROCEDURE
- New for Stage 2:
- Do Black Box Testing
- In week 8: complete WHITE box testing
- Write unit tests before code
- Coverage Testing
- Automated functional system tests using Costello
- Automated Daily Build
- Do Black Box Testing
- Every person needs to write udates to the User Manual for their requirement(s) and needs to submit them to Tracy so she can add them to the User Manual
- Write Cosetello System Tests, after Thursday's homework, for new requirements
From Release:
* More thorough, product specific javadocs, don't just use @override * Fix some system tests
- Case 22
- needs procedure rewrite
- Case 16
- edit procedure and put into test data (follow other cases)
* REQ. 10 NOT WHAT USER WANTED
Known Issues from Release:
* OK doesn't save settings without apply * In Preferences Dialog, uses wrapping not misc wrapping for misc wrapping page -- FIXED * Change testcase/UM documentation (Case 16) -- FIXED * Forward slash in undo -- FIXED
Maintenance Work: DUE MAY 15th
1. Fix the drop down menu for conventions (fix little bit hidden)
2. make help link (near label) to the UM predefined conventions section
3. add a predefined conventions section to the User Manual
4. fix name of conventions in files
- redo xml files
- DELEGATION:
- IAN
- PAUL
- TRACY
- STEPHANIE
Stage 2 Requirements:
1. Every panel in the settings dialog will have a help link linking to the corresponding section in the Jalopy User Manual.
2. ChangeStyle will allow the user to modify predefined conventions and save them as customized conventions that will appear in the conventions drop down box along with the original predefined conventions.
3. ChangeStyle implement Batch Undo, which presents the user with a dialog with a selectable list of files which can be undone, while displaying files which cannot be undone in grey.
4. Changes made by ChangeStyle’s formatting are visible immediately in the editor window, and when the Undo button is selected in the editor window, the editor window shows the undone code.
5. ChangeStyle's editor window will present a Format button to the user. -- BEING REMOVED!!!
6. The import and export convention functionality for ChangeStyle is working properly and is located in the Preferences Panel and is designed based on the approved UI prototype.
7. ChangeStyle allows the user to replace Headers and Footers containing some user-specified text in the corresponding panels and offers a help link to a new section in the User Manual describing Headers and Footers in more detail.
NEW**8. Every time a class or project is formatted by ChangeStyle, the 'status panel' at the bottom of BlueJ's window displays "Formatting... Done." When the undo feature is selected, the window will display "Undo Formatting... Done" -- ********Needs Feasibility
NEW**9. When the users clicks, the "Edit Style Conventions" button, no matter how many times, the Preferences panel only appears once.
Delegation:
1.Paul Help:Stephanie/Tracy
2.Ian Help:Richard/Mark
3.Richard Help:Paul
4.Richard Help:Tracy
6.Ian Help:Mark
7.Stephanie
8.Mark
9.Tracy
Tasks:
Stephanie
- schedule
- post notes and wsr
- make tickets
- system tests with costello after thurs
- maintanence req. 4 - due 5/15
- send tracy xml convention summary
- figure out what needed for requirement
- write updates to the User Manual for requirement 7 and submit to Tracy
Mark
- SET COMPONENT FIELDS ON TRAC - due ASAP (LATE)
- can change through wiki under admin page
- Components include: Jalopy, Extension, PreferenceGenerator?, MenuGenerator?, CUSTOM CLASSES?
- change request for removal of req. 5
- send tracy xml convention summary
- fix branching
- prototype editing
- figure out what needed for requirement
- write updates to the User Manual for requirement 8 and submit to Tracy by 5/13
Tracy
- make corrections to stage requirements
- get from meeting notes
- post maintenance work
- add requirements to SRS
- maintanence req. 4 - due 5/15
- Write User Manual Conventions section
- talk to customer about questions for stage
- figure out what needed for requirement
- write updates to the User Manual for requirement 9 by 5/13
Ian
- fix prototype
- add help button under EDIT
- procedure rewrite for test case 22
- maintenance req.3 - due 5/15
- figure out what needed for requirement
- write udates to the User Manual for requirements 2/6 and submit to Tracy by 5/13
- write universal BClass stub for unit testing
Richard
- req. 8 feasibility Due THURSDAY
- prototype editing
- figure out what needed for requirement
- write updates to the User Manual for requirements 3/4 and submit to Tracy by 5/13
Paul
- automated Daily Build
- Tues - 5/13
- maintenance req. 2 - due 5/15
- figure out what needed for requirement
- write updates to the User Manual for requirement 1 and submit to Tracy by 5/13
Luna Team Meeting Notes - 5/1/08
Notes:
- decide requirements – write quantifiably
Proposed Maintenance Work:
1. Fix the drop down menu for conventions (fix little bit hidden) 2. make label for box that links to the UM predefined conventions section 3. add a predefined conventions section to the User Manual 4. fix name of conventions
- redo xml files
Proposed Stage 2 Requirements: 1. Make multiple help links (vs. Stage 1.0 universal button)
- make label links
- use lookup table/tool tips
Official Requirement 1: Every panel in the settings dialog will have a personal help link linking to the corresponding section in the Jalopy User Manual.
2. Dynamic customzed conventions
- have a folder where the user can place their own conventions which will be listed in the drop down menu
Official Requirement 2: ChangeStyle will allow the user to modify predefined conventions and save them as customized conventions that will appear in the conventions drop down box along with the original predefined conventions.
3. Batch Undo - UI Prototype
Official Requirement 3: ChangeStyle implement Batch Undo, which presents the user with a dialog with a selectable list of files which can be undone, while displaying files which cannot be undone in grey.
4. Use text replacement vs. file replacement
- show immediate change in editor
- use undo button in editor
- make sure that the editor doesn't blank out using undo(in editor) after formatting
Official Requirement 4: Changes made by ChangeStyle’s formatting are visible immediately in the editor window, and when the Undo button is selected in the editor window, the editor window shows the undone code.
5. Personal editor with format button inside Modify BlueJ editor to present a Format button to the user.
Official Requirement 5: ChangeStyle's editor window will present a Format button to the user.
6. Reorganize settings dialog
- remove general/projects/printer label/code inspector
- add those features (and predefined conventions) to new Changestyle dialog
- on main settings dialog only have button
- add those features (and predefined conventions) to new Changestyle dialog
- move predefined conventions to general pane
- Fix apply/ok to save naming for conventions correctly
- when hit export - flush conventions first then export
- currently has tempermental functionality
- Fix multiple settings dialog pop-up
- Move import/export convention functionality from General Tab in SettingsDialog? to ChangeStyle Preferences Panel and redesign the preferences panel based on the approved UI Prototype ...
Official Requirement 6: The import and export convention functionality for ChangeStyle is located in the Preferences Panel and is designed based on the approved UI prototype.
7. Header and footer tabs - change to do single not multiple - omit error message
- give text field for header input and one for footer
- Delete "Delete Headers/Footers" and replace with "Replace Header/Footer Containing..." in Header and Footer panels. Have help button link to new User Maunal section describing Headers and Footers more in detailed.
Official Requirement 7: ChangeStyle allows the user to replace Headers and Footers containing some user-specified text in the corresponding panels and offers a help link to a new section in the User Manual describing Headers and Footers in more detail.
Tasks:
Stephanie
- send reqs to Tracy
- defect ticket for "loose"
- post notes and wsr
- make tickets
- review stage 2 requirements list and send Stephanie what top three requirements choices
Mark
- SET COMPONENT FIELDS ON TRAC - due SATURDAY by midnight
- can change through wiki under admin page
- Components include: Jalopy, Extension, PreferenceGenerator?, MenuGenerator?, custom classes?
- review stage 2 requirements list and send Stephanie what top three requirements choices
Tracy
- batch formatting - add requirement to SRS
- post new reqs on wiki staged delivery plan
- talk to customer about layout and one help links
- review stage 2 requirements list and send Stephanie what top three requirements choices
Ian
- make jalopy error message more verbose
- layout sketches – UI Prototype?
- review stage 2 requirements list and send Stephanie what top three requirements choices
Richard
- feasibility for editor feature and text replacement vs. file replacement
- automatic revision rework
- batch undo prototype
- * review stage 2 requirements list and send Stephanie what top three requirements choices
Paul
- final Stage 1 LOC
- estimate for stage 2
- review stage 2 requirements list and send Stephanie what top three requirements choices
Luna Team Meeting Notes - 4/29/08
Notes:
- WE GOT ACCEPTED!! YEA!
- decide requirements
- Release 2 : JUNE 3rd!!!!
HEADS UP!!!! : Formal white box tests
From Release:
More thorough, product specific javadocs, don't just use @override Fix some system tests
Proposed Maintenance Work:
1. Fix the drop down menu for conventions (fix little bit hidden) 2. make label for box that links to the UM predefined conventions section 3. add a predefined conventions section to the User Manual 4. fix name of conventions
- redo xml files
Proposed Stage 2 Requirements:
1. Make multiple help links (vs. Stage 1.0 universal button)
- make label links
- use lookup table/tool tips
2. Dynamic predefined conventions
- have a folder where the user can place their own conventions which will be listed in the drop down menu
3. Batch Undo 4. Use text replacement vs. file replacement
- show immediate change in editor
- use undo button in editor
- make sure that the editor doesn't blank out using undo(in editor) after formatting
6. Reorganize settings dialog
- remove general/projects/printer label/code inspector
- add those features (and predefined conventions) to new Changestyle dialog
- on main settings dialog only have button
- add those features (and predefined conventions) to new Changestyle dialog
- move predefined conventions to general pane
- Fix apply/ok to save naming for conventions correctly
- when hit export - flush conventions first then export
- currently has tempermental functionality
7. Header and footer tabs - change to do single not multiple - error message
- give text field for header input and one for footer
Tasks:
Stephanie
- send reqs to Tracy
- defect ticket for "loose"
- post notes and yest. email to dalbey
- make tickets
Mark
- add link for stage 2 requirements
- add stage 2 user manual link
Tracy
- batch formatting - add requirement to SRS
- post new reqs on wiki staged delivery plan
- talk to customer about layout and one link per tab vs. one per thing
Ian
- Costello tutorial - due thurs
- make jalopy error message more verbose
- layout sketches
Richard
- feasibility for req. 4
- automatic revision rework
Paul
- Costello tutorial - due thurs
- final Stage 1 LOC
- estimate for stage 2
Luna Team Meeting Notes - 4/24/08
Notes:
- write JUNIT tests for code that is testable
o if a GUI change then use ABBOT to test (UNIT)
- two choices to download --- not same
- only zip has costello (Costello for system tests)
o or ask Professor Dalbey for help
- 2 defects a week
- emergency change request...
- add pop to display message that code couldn't be formatted
- acceptance test meeting at 7pm on Monday in lab
Tasks:
Stephanie
- update/make tickets
- make more reports with due date
- check version number
- JUnit test by Friday to Richard (and Stephanie for binder)
- send system test cases to Richard
- update project vision
- add wiki links for Test Matrix, Test Cases, Test Results
- add test cases to wiki page after compilation
- make document of all source code (or equivalent) and send to Stephanie for binder
- print inspection log
- rewrite email for code proposal
Mark
- send Stephanie system test cases
- JUnit Tests by Friday to Richard(and Stephanie for binder)
- Add whether or not change request proposals are approved/denied
- Make folder in repository for JUnit tests
- pictures for user manual
- make document of all source code (or equivalent) and send to Stephanie for binder
- add change proposal for pop-up unsuccessful format
Tracy
- JUnit test by Friday to Richard(and Stephanie for binder)
- get User Manual Up on wiki
- update SRS
- release notes
- fix requirements page and staged delivery plan for more qunatifiable requirements
- make document of all source code (or equivalent) and send to Stephanie for binder
- add xp, os 10, linux for system requirements - add to requirements
Ian
- JUnit test by Friday to Richard(and Stephanie for binder)
- send Jalopy known issues list to professor Dalbey
- possibly change UI????
- make document of all source code (or equivalent) and send to Stephanie for binder
Richard
- JUnit test by Friday to Richard (and Stephanie for binder)
- over weekend run system tests and unit tests a few times
- post results and matrix on wiki
- make document of all source code (or equivalent) and send to Stephanie for binder
Paul
- JUnit test by Friday to Richard (and Stephanie for binder)
- Update Daily Build Procedure on wiki
- continue daily build
- make document of all source code (or equivalent) and send to Stephanie for binder
- submit change request for batch formatting
Luna Team Meeting Notes - 4/22/08
Notes:
- check where everyone is
- Paul introduced team to daily build
- write JUNIT tests for code that is testable
- if a GUI change then use ABBOT to test
- or ask Professor Dalbey for help
- system tests not automated (yea!)
Tasks:
Stephanie
- post past two meeting notes
- update/make tickets
- make more reports with due date
- look at mark’s change requests
- figure out how to add new fields
- trac.ini is place
- check version number
- remove jalopy’s history functionality
- inspection preparation (Ian/Mark)
- update schedule
- defect reports for stage 0.1 (my two changes)
- JUnit test by Friday to Richard
- send system test cases to Richard
- print out test cases for OH tomorrow
Mark
- Jalopy tests 4.3.5.3 – 4.3.6.1 by Sunday @ midnight
- look at mark’s change requests
- inspection preparation (Stephanie/Ian)
- JUnit test by Friday to Richard
Tracy
- look at mark’s change requests
- JUnit test by Friday to Richard
- inspection preparation (Paul/Richard)
Ian
- look at mark’s change requests
- inspection preparation (Stephanie/Mark)
- JUnit test by Friday to Richard
- send Jalopy known issues list to professor Dalbey
Richard
- look at mark’s change requests
- inspection preparation (Tracy/Paul)
- JUnit test by Friday to Richard
Paul
- look at mark’s change requests
- inspection preparation (Tracy/Richard)
- JUnit test by Friday to Richard
Luna Team Meeting Notes - 4/17/08
UPDATED SCHEDULE:
System Tests : Due Friday 18th @ midnight
Jalopy Tests : Due Sunday 20th @ midnight to Tracy
Write Code/comments – Due Wednesday 23rd @ noon
Inspection Meeting (complete inspection at home) : Thursday 24th in LAB
Unit Testing using JUnit: Due Saturday 26th at midnight
All JOB-specific documents and such: Due Saturday the 26th at midnight
Final QA stuff: Due Monday 8pm.
I want EVEREYTHING done by 8PM on MONDAY.
Notes:
- Schedule solidify
- split up inspections
- next Thursday in lab - meeting
- split up system test cases due FRIDAY
- Tracy 3.0.1-3.0.5
- Mark 3.0.6-3.0.9
- Paul 3.0.10-3.0.13
- Ian 3.0.14-3.0.18
- Stephanie 2.1.4,6,7,12,13
- for new code - write up test cases
Tasks:
Stephanie
- post todays meeting notes
- update/make tickets
- figure out how to add new fields - trac.ini is place
- System Tests
- update schedule
- Jalopy tests 4.3.5.2 – 4.3.5.2.2 by Sunday @ midnight
Mark
- Jalopy tests 4.3.5.3 – 4.3.6.1 by Sunday @ midnight
- System tests
Tracy
- Jalopy tests 4.3.5.1 (all) by Sunday @ midnight
- Change requirements list
- System tests
Ian
- Jalopy tests 4.3.6.2 – 4.3.7.3 by Sunday @ midnight
- System tests
Richard
- Jalopy tests 4.3.8 (all) by Sunday @ midnight
- System tests
Paul
- Jalopy Tests 4.3.4.2.2 – 4.3.4.3 by Sunday @ midnight
- System tests
Luna Team Meeting Notes - 4/15/08
Notes:
- QA managers meet with us (Luna) and distribute Jalopy tests created by Ian
- Don’t submit code to svn prior to inspection – must pass inspection before commit
Team Notes:
- System test cases break up moved to Thursday
- EMERGENCY!: we need to create a solid list of requirements for stage one
- need to estimate time for each potential requirement and then compile average
- Jalopy tests due to Tracy by Sunday at Midnight
Tasks:
Stephanie
- post todays meeting notes
- update/make tickets
- learn project plan and edit as needed
- figure out how to add new fields - trac.ini is place
- one for defects
- review Stage 1 scoresheet/release checklist/criteria list
- update schedule
- email Tracy Ian’s Jalopy list
- Jalopy tests 4.3.5.2 – 4.3.5.2.2 by Sunday @ midnight
- Team Manager 1.0 Release duties complete by 27th @ 5pm
- see schedule
Mark
- Jalopy tests 4.3.5.3 – 4.3.6.1 by Sunday @ midnight
- Emergency hours estimate for requirements
- Change Manager 1.0 Releases duties complete by 27th @ 5pm
- see schedule
Tracy
- Jalopy tests 4.3.5.1 (all) by Sunday @ midnight
- write stage 1 requirements (update)
- update stage delivery plan with stage 1 requirements
- Emergency hours estimate for requirements
- Analyst 1.0 Release duties complete by 27th @ 5pm
- see schedule
Ian
- Jalopy tests 4.3.6.2 – 4.3.7.3 by Sunday @ midnight
- learn QA plan and edit as needed
- Emergency hours estimate for requirements
- QA Manager 1.0 Release duties complete by 27th @ 5pm
- see schedule
Richard
- Jalopy tests 4.3.8 (all) by Sunday @ midnight
- learn test plan and edit as needed
- create system tests cases for 0.1 and 1.0
- email steph
- Emergency hours estimate for requirements
- Test Manager 1.0 Release duties complete by 27th @ 5pm
- see schedule
Paul
- Jalopy Tests 4.3.4.2.2 – 4.3.4.3
- Make Daily Build Plan
- Emergency hours estimate for requirements
- Design/Implementation Manager 1.0 Release duties complete by 27th @ 5pm
- see schedule
Luna Team Meeting Notes - 4/10/08
Notes
- class discuss stage 1 requirements
- group discussed top risks
- check if need to change:
- system requirements: add for Mac and Linux users
- don't make reqs unnecessarily restrictive
- install instructions correct
- make change requests for changes!!!!!
- Prof. Dalbey discussed what needs to happen next:
- Analyst
- take changes list and put into 1.0 requirements so we can test feasibility
- update staged delivery plan
- update user manual
- Write system test cases for 0.1 and 1.0 features
- feasibility for stage 1.0 features
- generate solutions or walk-arounds
- Jalopy Tests
- do we have the current version of Jalopy?
- is there a list of known defects
- new release soon?
- will they fix defects we find?
- not automated
Teams Notes:
- defect tracking
- will need to update user manual and staged delivery plan
- richard didn't bring risks list
- Stage 1 rough requirements:
- put format in class and tools menu
- no feasibility needed - already was in tools menu
- online help in settings dialog or use tool tips
- Ian and Mark feasibility by tues.
- fix undo functionality
- look at Jalopy known issues
- default switch formatting option
- Paul feasibility by Tues
- put format in class and tools menu
Tasks:
Stephanie
- post todays meeting notes
- update/make tickets
- learn project plan and edit as needed
- post LOC when recieve from Paul
- figure out how to add new fields - trac.ini is place
- one for defects
- review Stage 1 scoresheet/release checklist/criteria list
- compile Risks
- break up of system test cases if needed
- assign jalopy tests when get split up list from Ian
- email hour requirements
Mark
- make change request proposal for change to requirements
- change will effect user manual and product
- make change request for figure 10 change in user manual
- create risks list
- learn change plan and edit as needed
- branch project (familiarize with)
- need comments first
- wait to do til Thursday 4/8
- make "release" folder in respository and put correct jar files in corresponding folder
- make link to current build
- review Stage 1 scoresheet/release checklist/criteria list of your positions duties
- Feasibililty for using toolTips - req. 7
Tracy
- review Stage 1 scoresheet/release checklist/criteria list of your positions duties
- due Ian's jarfile assignment
- write stage 1 requirements
- update stage delivery plan with stage 1 requirements
- email richard old requirements
- email paul new requirements
Ian
- learn QA plan and edit as needed
- review Stage 1 scoresheet/release checklist/criteria list of your positions duties
- look up features of jalopy, split up list to test
- feasibility for putting online help in settings dialog
Richard
- learn test plan and edit as needed
- review Stage 1 scoresheet/release checklist/criteria list of your positions duties
- due Ian's jarfile assignment
- create system tests cases for 0.1 and 1.0
- email steph
Paul
- review Stage 1 scoresheet/release checklist/criteria list of your positions duties
- due Ian's jarfile assignment
- review code to see if need to add comments/psuedocode
- in 0.1 before branch
- delayed to after 4/10/08 due to repository rework
- estimate planned lines of code
- after recieve reqs from Tracy
- due by Thursday
- redo LOC count to not have comments
- default switch feasibility
Luna Team Meeting Notes - 4/8/08
Notes:
- Tracy in customer conference call
- class reviewed/discussed
- action item tracking - using trac tickets
- add new field - project plan
- due date
- status
- add new field - project plan
- change control plan
- defect tracking through trac tickets
- retroactively create defect ticket and mark it as fix
- Stephanie make 1st 3 for changes made
- retroactively create defect ticket and mark it as fix
- system tests
- ad-hoc: no more
- new approach: systematic
- read about for HW
- Stage 1 delivery plan
- Thursday
- each team copy of user manual
- edit UM to reflect stage 1 changes
- edit design documents as needed
- class diagram
- psuedocode
- look at code
- add comments of psuedocode if not there
Team Notes:
- Stephanie now risk manager
- team decided how to fix problem of updating jarfile
- have working copy in the repository and then seperate folders contain release of the jarfile
- Heads Up: Stage 1 Release Dates
Stage 1 complete due 4/29 Jalopy Tests due 4/22 System Tests due 4/17
- Mark wants team make comments for revisions meaningful
- say the java file you edited in the comment
- then say what you did to file
- Go over design next meeting
Tasks:
Stephanie
- post todays meeting notes
- update/make tickets
- create risks list
- learn project plan and edit as needed
- fix jar file to release 119
- today by 5
- post LOC when recieve from Paul
- figure out how to add new fields - trac.ini is place
- one for defects
- add defect tickets
- one for defects
- review Stage 1 scoresheet/release checklist/criteria list
- due Ian's jarfile assignment
Mark
- make change request proposal for change to requirements
- change will effect user manual and product
- make change request for figure 10 change in user manual
- create risks list
- learn change plan and edit as needed
- branch project (familiarize with)
- need comments first
- wait to do til Thursday
- make "release" folder in respository and put correct jar files in corresponding folder
- make link to current build
- review Stage 1 scoresheet/release checklist/criteria list of your positions duties
- due Ian's jarfile assignment
Tracy
- double check usermanual pic - mess with more
- create risks list
- add list from google group to page
- wikipage:Stage 1 and Stage 2 Plan - rename page
- review Stage 1 scoresheet/release checklist/criteria list of your positions duties
- due Ian's jarfile assignment
- send Ostrich html of User Manual
Ian
- create risks list
- learn QA plan and edit as needed
- review Stage 1 scoresheet/release checklist/criteria list of your positions duties
- due Ian's jarfile assignment
Richard
- create risks list
- learn test plan and edit as needed
- review Stage 1 scoresheet/release checklist/criteria list of your positions duties
- due Ian's jarfile assignment
Paul
- create risks list
- download LOC tool and report project LOC by Thursday meeting
- review Stage 1 scoresheet/release checklist/criteria list of your positions duties
- due Ian's jarfile assignment
- review code to see if need to add comments/psuedocode
- in 0.1 before branch
Luna Team Meeting Notes - 4/3/08
- Requirement changed... if code is not compilied, gray out format button
- push back deadline - to 3:30 pm
- add to user manual
- how will user know to compile first
- maybe instead of gray out, let them click it and pop up a message saying to compile first
- disable button
- display message "not compiled"
- Richard completed this fix in class - now format is greyed out and next to the format "(not compiled)" shows
- display message "not compiled"
- show "must compile method"
- disable button
- Richard is handling how to fix
- disabled with "noty compiled" message next to format option
- Change Request!!
- class meeting
- impact; can't get jar file ready intime for release today
- change
- Need to update jar file at 3pm
Tasks:
Stephanie
- meet paul to in CSL at 3pm to make jar file for 0.1 release
- update/make tickets
Mark
- make change request proposal for change to requirements
- change will effect user manual and product
- make change request for figure 10 change in user manual
- add intstructions to download
- DUE by 3:15PM TODAY
- change stage 1 to stage 0.1 on wiki
- Fri by MIDNIGHT
Tracy
- double check usermanual pic
- change release notes
- document in known issues: 1. that our "undo button" requirement is not completed
- that the class agreed that the compiled check won't work
- before 3pm TODAY
- document in known issues: 1. that our "undo button" requirement is not completed
- add user manual to svn
Ian
Richard
- please attempt to finish the undo button
- if this cannot be completed before 3pm then email and let me know the status
Paul
- Meet Stephanie at 3 in CSL to make final Jar file for 0.1 release
Luna Team Meeting Notes - 4/1/08
Job Changes:
Mark - Change Manager
Stephanie - Team Manager
Tracy - Analyst
Paul - Design/Implementation Manager
Ian - QA Manager
Richard - Test Manager
Notes:
- Team decided we will use version number in style of complete release, followed by stage release, followed by version number of svn (ex: 0.1.88)
- Team decided to change group weekly status report on Monday
- Team decided to have a "time update" for the week due by Sunday at 8PM
- Team decided to no longer have weekly status reports but on the condition we religiously update the status of our tickets. If this doesn't happen we will revert to individual status reports
- Team split up work to get stage one release of ChangeStyle complete
Need to complete:
- Code into framework = IAN
- Undo formatting = RICHARD
- Handle uncompiled code = STEPHANIE
- link/description in "about" box = TRACY
More Notes
In eclipse, under the project tab, follow the pulldown menu and TURN OFF the Build Automatically option; Under the clean project option, TURN OFF the Rebuild After Clean option... (hints from Ian and Richard so the class files of the projects won't be put on the repository)
Tasks:
Stephanie
- change permissions for wiki
- switch Mark and Tracy
- under admin part of wiki
- make new name tag sheet
- create tickets for EVERYTHING
- ticket for Tracy to make sure everything is updated from last quarter
- change ticket info via shell
- from address for tickets
- change job descriptions link to 309 page on Luna wiki
- write up and post team meeting minutes on wiki
- edit source code and handle if call format on uncomplied code or not
- by MIDNIGHT 4/2/08
- download eclipse
Mark
- create download page for stage 1 release
- update User Manual image
- create seperate folder for the stage 1 user manual in repository
Tracy
- add stage 1 User Manual to repository
- make image change to stage 1 user manual
- edit source code and add a link to our stage 1 user manual and a description of ChangeStyle in the "about" box
- by MIDNIGHT 4/2/08
Ian
- get code into framework
- by 9PM 4/1/08
- email team when done
Richard
- edit source code and handle undo formatting problem
- by MIDNIGHT 4/2/08
Paul
- work on getting all the libraries into a single jar file and put in the repository
- by MIDNIGHT 4/2/08
Meeting Notes - 3/11/08
Reminder
- Check Meeting Notes for assigned tasks
- Check and update tickets (if complete or not)
- High Level Design DUE
- Detailed Level Design DUE
Steph
- Add meeting notes and Progress Report
- Create Download page (Other than Feasibility)
- Change User Manual to "User Manual Prelimary"
- Add Stage 1 User Manual
- Add "Analysis Issues and Trade off" Page
Mark
- Go over Pros/Cons of features we are not implementing in Jalopy
- Send ChangestyleMenu? to Tracy - NOT DONE
- Write wordage for download page. 3/16
- Send pictures for edited User Manual to Tracy 3/14.
- Email Richard ChangeStyle Menu - NOT DONE
Tracy
- Send out meeting notes from 3/6/08 DONE
- Action items
- Go through User Manual and edit writing.
- Send Dalbey email when is complete
- Update ALL WIKI Information!!!!!!
Richard
- Create a High level Design for ChangeStyle DONE
- Make sure pseucode is correct and constants. By Sat DONE
- Email Paul – NOT DONE
- Add changes to High Level Design from FTR DONE
- Look at Tortoise to see about versions - TBA
Ian
- Research feasibility of undo and other features in jalopy
- Pros/ Cons for Jalopy 3/17
Paul
- QA of High Level design DONE
- Compose FTR Checklist for High Level Design DONE
- QA Detailed Design aim DONE
- Summary of FTR by Tues DONE
Notes
- High Level Design was moved to be due Tues, 3/11.
- Detailed Design was moved to be due Thurs 3/11
- FTR for High Level Design 3/6
Meeting Notes - 3/6/08
Reminder
- Check Meeting Notes for assigned tasks
- Check and update tickets (if complete or not)
- Status Report
- EVERYONE add email to settings in wiki!!!
- Look at Empty Set's FTR!!
Steph
- Add SRS to wiki - not SRS html code
- Add meeting notes and Progress Report
- Add that our SRS won!
- Create Download page By Today
Mark
- EMAIL SRS to Steph DONE
- Email philosophy DONE/LATE
- Email customer about using Jalopy's formatting style. DONE
- Go over Pros/Cons of features we are not implementing in Jalopy
- Send ChangestyleMenu? to Tracy
- Write wordage for download page. Tues
Tracy
- Send out meeting notes from 3/6/08
- Action items
- Pseudocode for ChangeStyleMenu? 3/4 - Took form Mark- gave back
- Go through User Manu and make sure it is like extended prototype.
Richard
- Create a High level Design for ChangeStyle DONE
- Make sure pseudocode is correct and constant. By Sat -email Paul
- Add changes to High Level Design from FTR
Ian
- Research feasibility of undo and other features in jalopy
- Send Pro/Cons for Highlighting to Steph and Mark. DONE
Paul
- QA of High Level design
- Compose FTR Checklist for High Level Design DONE
- QA Detailed Design aim for Mon
- Summary of FTR by Tues
Notes
- High Level Design was moved to be due Tues, 3/11.
- Detailed Design was moved to be due Thurs 3/11
- FTR for High Level Design 3/6
- FTR is on Thursday
- UI Prototype link to feasibility for Setting Changes
- Add Credit Page to Detailed Level Design
- Update User Manual to go with Extended Prototype
- Update SRS to requirements
- Edit Bluej's editor
- Make our own editor.
Meeting Notes - 3/4/08
Reminder
- Check Meeting Notes for assigned tasks
- Check and update tickets (if complete or not)
- EVERYONE add email to settings in wiki!!!
- Edit psuedocode by tonight
- Look at Empty Set's FTR!!
Steph
- Add SRS to wiki - not SRS html code
- Add meeting notes and Progress Report DONE
- Post Philosophy NOT Emailed by Mark
- Prototype implementing Bluej with a reference file using Jalopy. Due Tues 2/28 LATE/DONE
- Extended Link prototype DONE
- Pseudocode for ChangeStyle 3/4
Mark
- EMAIL SRS to Steph
- Email philosophy NOT DONE
- Email customer about using Jalopy's formatting style.
- Prototype implementing Bluej with a reference file using Jalopy. Due Tues 2/28 LATE
- Emailed UI Prototype and User Manual DONE
- Get pictures of Extended Prototype to Ian by 6:00 pm DONE
Tracy
- Send out meeting notes from 3/4/08
- Action items
- Redo schedule in wiki DONE
- Prototype implementing Bluej with a reference file using Jalopy. Due Tues 2/28 LATE/DONE
- Changes Marks, Ian, Richard and Paul password change DONE
- Download Tortoise DONE
- Pseudocode for ChangeStylePref? 3/4
- Pseudocode for ChangeStyleMenu? 3/4- Took form Mark
- Send Dalbey Extended Prototype. DONE
- Go through User Manu and make sure it is like extended prototype.
Richard
- Create a High level Design for ChangeStyle DONE
- Pseudocode for RevertBackupAction? 3/4
- Update High Level Design and send to Paul DONE
Ian
- Research feasibility of undo and other features in jalopy
- Get together with Paul to go over ActionFormat? DONE
- Pseudocode for ChangeStylePreview? 3/4
- Create links for pictures of Extended Prototype by Tomorrow Morning DONE
- notify Tracy to look over. DONE
- Send Pro/Cons for Highlighting to Steph and Mark.
Paul
- QA of High Level design
- Compose FTR Checklist for High Level Design DONE
- Download Tortoise
- Email format pseudocode format to all. DONE
- meet with Ian to over ActionFormat? DONE
- Pseudocode for ActionFormat? 3/4
Notes
- High Level Design was moved to be due Tues, 3/11.
- Detailed Design was moved to be due Thurs 3/11
- FTR for High Level Design 3/6
- FTR is on Thursday
- UI Prototype link to feasibility for Setting Changes
- Add Credit Page to Detailed Level Design
- Update User Manual to go with Extended Prototype
- Update SRS to requirements
Meeting Notes 2/28/08
Reminder
- Check Meeting Notes for assigned tasks
- Check and update tickets (if complete or not)
- Status Reports due
Steph
- Add meeting notes and Progress Report
- Post Philosophy NOT Emailed by Mark
- Prototype implementing Bluej with a reference file using Jalopy. Due Tues 2/28
- Extended Link prototype
- Pseudocode for ChangeStyle 3/4
Mark
- Email philosophy NOT DONE
- Email customer about using Jalopy's formatting style.
- Prototype implementing Bluej with a reference file using Jalopy. Due Tues 2/28
- Emailed UI Prototype and User Manual
- Pseudocode for ChangeStyleMenu? 3/ 4
- Get pictures of Extended Prototype to Ian by 6:00 pm
Tracy
- Send out meeting notes from 2/26/08 and 2/28/08 DONE
- Action items
- Redo schedule in wiki DONE
- Prototype implementing Bluej with a reference file using Jalopy. Due Tues 2/28
- Changes Marks, Ian, Richard and Paul password change
- Download Tortoise
- Pseudocode for ChangeStylePref? ¾
- Send Dalbey Extended Prototype.
Richard
- Create a High level Design for ChangeStyle DONE
- Pseudocode for RevertBackupAction? 3/4
- Update High Level Design and send to Paul
Ian
- Research feasibility of undo and other features in jalopy
- Get together with Paul to go over ActionFormat?
- Pseudocode for ChangeStylePreview? 3/4
- Create links for pictures of Extended Prototype by Tomorrow Morning
- notify Tracy to look over.
Paul
- QA of High Level design
- Compose FTR Checklist for High Level Design
- Prototype implementing Bluej with a reference file using Jalopy. Due Tues 2/28 DONE
- Download Tortoise
- Email format pseudocode format to all.
- meet with Ian to over ActionFormat?
- Pseudocode for ActionFormat? 3/4
Notes
- High Level Design was moved to be due Tues, 3/11.
- Detailed Design was moved to be due Thurs 3/11
- FTR for High Level Design 3/6
- Broke up Detailed Design
| Name | Class |
| Richard | RevertBackupAction? |
| Ian | ChangeStylePreview? |
| Tracey | ChangeStylePref? |
| Mark | ChangeStyleMenu? |
| Stephanie | ChangeStyle |
| Paul | FormatAction? |
- FTR is on Thursday
- UI Prototype link to feasibility for Setting Changes
- Extended Prototype
- Add other checkbox
- Undo
- Extended Prototype
- Mark - Get pictures by 6:00 pm
- Ian Creates links for pictures by Tomorrow Morning
- Turn in to Dalbey by 5:00 pm
- Go over tortoise
- Look over
Meeting Notes - 2/26/08
Reminder
- UI Prototype
- Check Meeting Notes for assigned tasks
- Check and update tickets (if complete or not)
Steph
- Add meeting notes and Progress Report DONE
- Post Philosophy NOT Emailed by Mark
- Prototype implementing Bluej with a reference file using Jalopy. Due Tues 2/28
- Add Class Diagrams to wiki, email form Richard.
Mark
- Email philosophy and pic for SRS to Steph (by 2/10) NOT DONE
- Email customer about using Jalopys formatting style. DONE
- Compile User Manual and turned over to Tracy
- Prototype implementing Bluej with a reference file using Jalopy. Due Tues 2/28
- Email the customer the User Manual and UI Prototype.
Tracy
- Send out meeting notes from 2/26/08
- Action items
- Redo schedule in wiki change FTR
- Prototype implementing Bluej with a reference file using Jalopy. Due Tues 2/28
Richard
- Create a High level Design for ChangeStyle Last min
- Need to go over
- Get together with Ian to go over Design and Prototype. DONE
- Email Steph Class Diagrams
- Look into detailed design and breaking it up
- Add private methods to javadocs
Ian
- Research feasibility of undo and other features in jalopy DONE
- UI Prototype, cannot be a Power Point (2/26) DONE
- Get together with Richard to go over Design and Prototype.
- Compile Jalpoy Manual for ChangeStyle (2/20) NVM
- Add formatting whole package to prototype.
Paul
- QA User Manual DONE
- Prototype implementing Bluej with a reference file using Jalopy. Due Tues 2/28
- QA High Level Design
Notes
- High Level Design was moved to be due Tues, 2/26.
- Detailed Design was moved to be due Thurs 3/7 NEED TO CHAGNE FOR FTR
- UI Prototype and User Manual next Tues 2/26 DONE on website.
- Due to QA and changed key functionality. DONE
- FTR for Detailed Design 2/5 Needs to be moved.
- FTR for Detailed Level Design
- Prototype implementing Bluej with a reference file using Jalopy. Due Tues 2/26 All except Ian and Richard
- May be able to deliever ChangeStyle like the UI Prototype in 2 weeks
- Go over what features that Jalpoy can and cannot do again, confussion so needed to go.
- Research Undo and how to do it.
- Talk to customer confirm window is planned to not be included in two weeks. Undo is.
- High Level Design due dtae is the same
- Detailed Design Date is changed to 3/11
- Take out Test Plans oof the shcedule
- Email Customer with jar file
- Email features of the Jalopy now crossrevences SRS
- Two Quarters project.
Top Risks
- Time, other classes
- Customer feedback
- Shorting schedule due date of the project
- Coordination scheduling,
- Contacting groups for FTR's
- Familiarity for problem domain
Meeting Notes 2/21/08
Reminder
- UI Prototype
- Check Meeting Notes for assigned tasks
- Check and update tickets (if complete or not)
- Status Reports are due tonight at 8:00 pm.
Steph
- Add meeting notes and Progress Report
- Post Philosophy NOT Emailed by Mark
- Edit Overview and Features Sections of User Manual (2/20) sent to Mark by Midnight.
- Credits Page User Manual.
- Prototype implementing Bluej with a reference file using Jalopy.
- Due Tues 2/26
- Add Javadocs to Wiki. 2/26
Mark
- Email philosophy and pic for SRS to Steph (by 2/10) NOT DONE
- Editing the Preferences Section of the User Manual (2/19) DONE
- Email customer about using Jalopy's formatting style. Attahed our ChangeStyle Prototype....rough draft.
- Get together Tracy Mark to go over Design for UI Prototype DONE
- Email to Ian before Sunday Night (2/17) DONE
- Compile User Manual
- Prototype implementing Bluej with a reference file using Jalopy. Due Tues 2/26 1
- Add SRS to WIKI 2/26
- Create Feature lists of Current ChangleStyle? to send to User.
- Add to Wiki. 2/26
Tracy
- Send out meeting notes from 2/12/08 and 2/14/08 DONE
- Send out meeting notes for 2/19/08
- Progress Report
- Action items
- Redo schedule in wiki add RTF and change RTF
- Edit Formatting Section of User Manual (2/20) sent to Mark by Midnight. DONE
- Prototype implementing Bluej with a reference file using Jalopy. Due Tues 2/26 2
- Recomiple USer Manual add Changes - take over for Mark
Richard
- High level Design for ChangeStyle (2/26)
- Get together with Ian to go over Design and Prototype. DONE
- Start work on Detailed Design
Ian
SICK
- UI Prototype, cannot be a Power Point (2/26)
- Get together with Richard to go over Design and Prototype.
- Compile Jalpoy Manual for ChangeStyle (2/20)
Paul
- Edit Requirements and Installation Sections of the User Manual (2/20) sent to Mark by Midnight.
- QA User Manual
- Prototype implementing Bluej with a reference file using Jalopy. Due Tues 2/26 3
- Contact Empty Set for FTR for THurs 2/28 for High Level Design
Notes
- High Level Design was moved to be due Tues, 2/26.
- Detailed Design was moved to be due Thurs 3/7
- UI Prototype and User Manual next Tues 2/26
- Due to QA and changed key functionality.
- FTR for Detailed Design 2/5
- Prototype implementing Bluej with a reference file using Jalopy. Due Tues 2/26 All except Ian and Richard
- Went over User Manual - All need to edit with changes and add to wiki. Sent Mark by Midnight
- Compile User Manual
- RTF will be next THursday on High Level Design
Meeting Notes 2/19/08
Reminder
- UI Prototype 2/14
- Check Meeting Notes for assigned tasks
- Check and update tickets (if complete or not)
- Contact and Contract for User Manual.
Steph
- Add meeting notes and Progress Report
- Post Philosophy NOT Emailed by Mark
- Edit Overview and Features Sections of User Manual (2/20) sent to Mark by Midnight.
- Credits Page User Manual.
- Prototype implementing Bluej with a reference file using Jalopy.
- Due Tues 2/26
Mark
- Email philosophy and pic for SRS to Steph (by 2/10) NOT DONE
- Editing the Preferences Section of the User Manual (2/19) DONE
- Email customer about using Jalopy’s formatting style.
- Get together Tracy Mark to go over Design for UI Prototype DONE
- Email to Ian before Sunday Night (2/17) DONE
- Compile User Manual
- Prototype implementing Bluej with a reference file using Jalopy. Due Tues 2/26
Tracy
- Send out meeting notes from 2/12/08 and 2/14/08 DONE
- Action items
- Redo schedule in wiki DONE
- Edit Formatting Section of User Manual (2/20) sent to Mark by Midnight.
- Get together with Mark to go over Design for UI Prototype DONE
- Email to Ian before Sunday Night (2/17) DONE
- Prototype implementing Bluej with a reference file using Jalopy. Due Tues 2/26
Richard
- Create a High level Design for ChangeStyle DONE - Need to go over
- Get together with Ian to go over Design and Prototype.
Ian
- Try to implement Jalopy with BlueJ Tues 2/12 DONE
- UI Prototype xml/configuration file prototype complete (2/14)
- Research feasibility of undo and other features in jalopy
- UI Prototype, cannot be a Power Point (2/19)
- Get together with Richard to go over Design and Prototype.
- Compile Jalpoy Manual for ChangeStyle (2/20)
Paul
- Final QA of SRS DONE
- Edit Requirements and Installation Sections of the User Manual
- (2/20) sent to Mark by Midnight.
- QA User Manual
- Prototype implementing Bluej with a reference file using Jalopy.
- Due Tues 2/26
Notes
- Individual Sections (2/19) without pictures is okay, need to know
what pictures are needed though
- High Level Design was moved to be due Tues, 2/26.
- Detailed Design was moved to be due Thurs 3/7
- UI Prototype and User Manual next Tues 2/26
- Due to QA and changed key functionality.
- FTR for Detailed Design 2/5
- UI Prototype - About how to format a whole package.
- "Format Package" is in "Tools".
- "Format Selected file" in "Tools"
- Formatting Double Panel window.
- Checkbox "Applied to all", if need be.
- Checkbox "Don’t show this again".
- "edit" = “Edit Settings"
- Change "Preferences" to "Custom Settings"
- Where to save the backup files: original files. Only if a full class file. Most recent.
Project Folder/.csbackups/
- Jalopy uses "Convention" we use "Style Preferences",
- "Convention File" to change "Style Preference Config File"
- Undo...only works immediately right after formatting code.
- Prototype implementing Bluej with a reference file using Jalopy.
- Due Tues 2/26 All except Ian and Richard
- Went over User Manual - All need to edit with changes and add to wiki. Sent Mark by Midnight
- Compile User Manual
Meeting Notes 2/14/08
Reminder
- UI Prototype 2/14
- Check Meeting Notes for assigned tasks
- Check and update tickets (if complete or not)
Steph
- Add meeting notes and Progress Report
- Post Philosophy NOT Emailed by Mark
- Overview and Features Sections of User Manual (2/19)
Mark
- Email philosophy and pic for SRS to Steph (by 2/10) NOT DONE
- Editing the Preferences Section of the User Manual (2/19)
- Email customer about using Jalopy's formatting style.
- Get together Tracy Mark to go over Design for UI Prototype
- Email to Ian before Sunday Night (2/17)
Tracy
- Send out meeting notes from 2/10/08 and 2/12/08
- Action items
- Redo schedule in wiki
- Formatting Section of User Manual (2/19)
- Get together with Mark to go over Design for UI Prototype
- Email to Ian before Sunday Night (2/17)
Richard
- Create a High level Design for ChangeStyle
- Get together with Ian to go over Design and Prototype.
Ian
- Try to implement Jalopy with BlueJ Tues 2/12 DONE
- UI Prototype xml/configuration file prototype complete (2/14)
- Research feasibility of undo and other features in jalopy
- UI Prototype, cannot be a Power Point (2/19)
- Get together with Richard to go over Design and Prototype.
Paul
- Final QA of SRS DONE
- Requirements and Installation Sections of the User Manual (2/19)
Notes
- High Level Design (2/21)
- Detailed Design (3/4)
- UI Prototype (2/21)
- User Manual (2/21)
- Individual Sections (2/19) without pictures is okay, need to know what pictures are needed though
- Test Plan (3/11)
- Plan on (3/6)
Meeting Notes 2/12/08
Reminder
- SRS DUE!!!!
- Complete SRS handin!!
- Hard Copy due T 4:00pm
- Check Meeting Notes for assigned tasks
- Check and update tickets (if complete or not)
Steph
- Add meeting notes
- Research limiting access to pages if not login
- Not possible
- Post Philosophy
- NOT Emailed by Mark
Mark
- Compile all parts of the SRS with updates and change
- Email philosophy and pic for SRS to Steph (by 2/10) NOT DONE
- completely finish fine combing SRS by Sat (2/9) and email to Paul NOT DONE
- Had SRS for Sunday's meeting
Tracy
- Send out meeting notes from 2/10/08 and 2/12/08
- Action items
- Redo schedule in wiki
Richard
- Research Violet UML tool - DONE
- Familiarize with Violet - DONE
- Only problem is that it sets left most and upper most as the margins.
Ian
- Try to implement Jalopy with BlueJ Tues 2/12
- UI Prototype xml/configuration file prototype complete (2/14)
- Research feasibility of undo and other features in jalopy
- UI Prototype, powerpoint 2/14
Paul
- Final QA of SRS
Notes
- Went over final QA of SRS
- User Manual
Meeting Notes 2/10/08
Reminder
- Make sure to include time log hours. Go back and look to see if you have any zeros for time hours.
- Check Meeting Notes for assigned tasks
- Check and update tickets (if complete or not)
Steph
- Add weekly status report and meeting notes
- Fix wiki page Mark wanted
- Research limiting access to pages if not login.
- Post Philosophy
- Credit Page post by Midnight 2/10
Mark
- Compile all parts of the SRS with updates and change DONE
- Email philosophy and pic for SRS to Steph (by 2/10) NOT DONE
- completely finish fine-combing SRS by Sat (2/9) and email to paul NOT DONE
- Send SRS to Paul by Midnight 2/10
Tracy
- Write tickets
- Send meeting notes
Richard
- Research Violet UML tool
- Familiarize with Violet
Ian
- Try to implement Jalopy with BlueJ Tues 2/12
- xml/configuration file prototype complete
- research feasibility of undo and other features in jalopy
- Prototype for highlighting?
Paul
- Send VIOLET link to Richard DONE
- QA of SRS prior to meeting on Sun
Notes
- Names for Formatter
- What is highlighting? Could do diff?
Meeting
- Prioritized SRS features and rules
- Discussed Ian's configuration file prototype (xml in eclipse)
- Discussed having different phases of prototype
- phase 1 : xml/configuration file
- phase 2 : GUI
Meeting Notes 2/7/08
Reminder
- Check Meeting Notes for assigned tasks
- Check and update tickets (if complete or not)
- JALOPY will work !! :)
Steph
- Add weekly status report and meeting notes
- Fix wiki page Mark wanted
- Research limiting access to pages if not login.
- Post Philosophy
Mark
- Compile all parts of the SRS with updates and change
- Email philosophy and pic for SRS to Steph (by 2/10)
- completely finish fine-combing SRS by Sat (2/9) and email to paul
Tracy
- SICK
Richard
- Research Violet UML tool
- Familiarize with Violet
Ian
- Try to implement Jalopy with BlueJ Tues 2/12
- xml/configuration file prototype complete
- research feasibility of undo and other features in jalopy
Paul
- Have Introduction done by midnight and email to Mark
- Send VIOLET link to Richard
- QA of SRS prior to meeting on Sun
Notes
- Names for Formatter
- we like ChangeStyle ; ask Tracy for approval on Sun.
- LabBook? recommendations:
- No space between entries; use lines to separate
- Don't include Meeting Notes
- Date and label every entry
- Have thorough explanations (of tasks completed, etc.)
- Make sure include individual status report and that it follows template (with good explanations)
- Prioritized SRS features and rules - Discussed Ian's configuration file prototype (xml in eclipse) - Discussed having different phases of prototype
- phase 1 : xml/configuration file
- phase 2 : GUI
Meeting Notes 2/5/08
Reminder
- Team SRS review – Mark
- Go over jalopy if time - Ian
- Look at Tickets
Steph
- Add weekly status report and meeting notes
- Look into SVN Tortoise - Can ask Ian/Richard if help
- SRS External Interfaces – email to Mark DONE
- Add a page for Mark to add Google group information
- Research limiting access to pages if not login.
- Post Philosophy
Mark
- Complete first draft of the SRS due 1/31 - PROBLEM
- Divide work
- SRS - Behavior and everything else due 2/5
- Compile all parts of the SRS and add to wiki DONE
- Email philosophy to Steph
Tracy
- Weekly progress report
- Create tickets (Look more into custom)
- Meeting agenda plan.
- If you want to do something during lab after the group meeting email me before 8:00 the night before
- SRS Informational Requirements – email to Mark due 2/5 DONE
Richard
- Looking at feasible prototype
- Feasibility prototype for Jindent to bluej extension - Yes
- Cant because it is a commercial
- Break into different feasibility
- Look for new formatting program to use due 2/5
- Research UML tool
Ian
- Feasibility prototype for Jindent to bluej extension - Yes
- Cant because it is a commercial
- Break into different feasibility
- Look for new formatting program to extend due 2/5 – Jalopy DONE
- Try to implement Jalopy with BlueJ Thurs 2/7
- Document
Paul
- Look at other manual and get general idea
- SRS Introduction – email to Mark due 2/5 DONE
Notes
- Monospaced code - Style Formatter not Beautifier
- Names for Formatter
- Sunday meeting for SRS Final overview noon - Library - UI Prototype is due sometime as feasibility prototype
Meeting
- Team SRS review
- Mark took over
- Individually looked at Part so SRS
- Jalopy – version 1.5
- take core and put a User interface on it
- Setting on xml file
- External interface when open in eclipse
- Side by side original and new
Meeting Notes 1/31/08
Reminder
- Look at Tickets
- Individual Status Report
- If you want to do something during lab after the group meeting email me before 8:00 the night before
Steph
- Add weekly status report and meeting notes
- Edit already existing changed manage plan with what was discussed in class
- Will add as changes come about
- Add open sources code for checkstyle link to web DONE
- Look into SVN Tortoise - Can ask Ian/Richard if help
- SRS External Interfaces – email to Mark
Mark
- Complete first draft of the SRS due 1/31 - PROBLEM
- Divide work
- SRS - Behavior and everything else due 2/5
- Compile all parts of the SRS and add to wiki
Tracy
- Weekly progress report
- Create tickets (Look more into custom)
- Create template for individual status DONE
- Add status "ongoing" DONE
- Change percent of code to lines of code DONE
- Add task item complete over task items DONE
- Meeting agenda plan.
- SRS Informational Requirements – email to Mark due 2/5
Richard
- Looking at feasible prototype
- Feasibility prototype for Jindent to bluej extension - Yes
- Cant because it is a commercial
- Break into different feasibility
- Look for new formatting program to use due 2/5
Ian
- Check/find source code for CheckStyle? DONE
- Open source - Send link to DONE
- Feasibility prototype for Jindent to bluej extension - Yes
- Cant because it is a commercial
- Break into different feasibility
- Look for new formatting program to exten due 2/5
Paul
- Look at other manual and get general idea
- looked at extensions in blueJ DONE
- Look into manual layouts to get ideas for format (Sun)
- Check to see if wiki format can be converter to doc/pdf DONE
- SRS Introduction – email to Mark due 2/5
Notes
- Can use JIndent for BlueJ
- Can be run in Java
- Add formatting to Jindent
- If they want to change
- Where the out file goes
- Tear into eclipse if need be
Next meeting -
- Team SRS review
Meeting Notes 1/29/08
Reminder
- WE HAVE A CUSTOMER!!!
- Look at Tickets
- Read through lab notebook template
All
- Read wiki format page
- Check tickets once a day
Steph
- Add weekly status report DONE
- Edit already existing changed manage plan with what was discussed in class
- Add open sources code for checkstyle link to web
- Look into SVN Tortoise - Can ask Ian if need help
Mark
- Complete first draft of the SRS due 1/31
- Wiki/Send out to all one day turn over
- Email Paul for check - DID NOT DO
Tracy
- Weekly progress report DONE
- Add/create time logs DONE
- Type and look over general schedule Add to web DONE
- Change user abilities in Trac DONE
- Create tickets and learn for next meeting (Look more into custom)
- Personal tickets DONE
- Task to action items DONE
- Create template for individual status
- Add status "ongoing"
- Change percent of code to lines of code
- Add task item complete over task items
Richard
- Looking at feasible prototype - After draft SRS
- waiting for feedback
Ian
- Check/find source code for CheckStyle? DONE
- Open source - Send link to
Paul
- Look at other manual and get general idea
- Looked at extensions in blueJ
- Look into manual layouts to get ideas for format (Sun)
- Check to see if wiki format can be converter to doc/pdf DONE
Notes
- Went over change control plan
- Discussed change submit request ? will be added to website
- Looked at SVN Tortoise
- Tried changing notice values to true
- Did not send email
- Looked into adding email notification to tickets
Meeting Minutes 1/24/08
Reminder
- Bring ideas for user interface from assigned formatters; look at Feasibility and Difficulty
- Individual Status Report DUE - put in lab note book
- Look at Tickets
- Read through lab notebook template
- SVN Training
All
- Read wiki format page --- help- guide
Steph
- Add weekly status report
- Will check if Trac can send out update on email (only for tickets)-DONE-not possible
- Write/add to wiki change manager plan. 1/29
Mark
- Contact Ian about JIndent and JIndentCustom for ideas (in class)
- Integrate the SRS due 1/29
- Will put SRS on Wiki on SAT
- All can look at it - 1 day turn over
- Email Paul for check
Tracy
- Weekly progress report
- Add/create time logs
- Add schedule to web
- Create tickets and learn for next meeting (Look more into custom)
- Personal tickets
- Task to action items
- Look at ownership
Richard
- Looking at feasible prototype (After SRS draft)
Ian
- Check/find source code for CheckStyle?
- Work with Rickard to make a general prototype (Prolonged)
- tried basic bracket prototype
Paul
- Look at other manual and get general idea
- looked at extensions in blueJ
- Look into manual layouts to get ideas for format (Sun)
- Check to see if wiki format can be converter to doc/pdf (DONE)
Notes
- SRS Common Features -- IDEAS --
- MUST ASK for formatting - menu button
- After/when user wants
- Temp copy of original and changed
- Setting file
- Custom Rules?
- Provide frame work
- Tags
- Don't have to go through users interface
- Side by side comparison
- One side rule using/ possible rules
- Approve change
- Different types of style options
- Different indent - spaces/tabs
- Formatting for brackets / blocks
- NOT option -- HAS TO COMPILE!!!!
- Pop up window "Warming: file does not Compiles!" Do you want to continue?
- Format all
- Keep backups - ask user if you want to save over/ keep backup
- Change color of changed formatting
- Changed comments
- MAYBE in BlueJ- Option for different new line character for browser--Keep BlueJ's--
- May want warnings
- ex/ import java.*
- Same thing as checkstyle
- Run checkstyle at same time -
- How in detailed for brackets and indenting
- ex/ empty lines at end of file/method
- try/catch different specs
- Method sorting - only main
- Javadocs
- Tags
- Template
- Do all files at the same time ??
- Error checking
- File not found
- Enforce explicit define variables
- Line Max
- SRS Quality
- Possible 3 clicks to start
- Change should but able to turn off/on
- Easy to install - jar file
- run on BlueJ
- Mass process (mult file)
- Support different type of class/interfaces
- Prototype
- Reusing checkstyle
- Adding changes
- Source code for checkstyle
Meeting Notes 1/22/08
Reminder
* Bring ideas for user interface - Feasibility and Difficulty
All
- Fiddle around with eclipse and other ide's for formatting coding
- Read wiki format page --- help- guide
Steph
- Add weekly status report to website
- Will check if Trac can send out update with email
- Figure change manager plan
- investigate AStyle and create its SRS with Feasibility and Difficulty (1/24)
- 12 hours a week
Mark
- investigate Hammurapi and create its SRS with Feasibility and Difficulty (1/24)
- Will Integrate the SRS from the individual (1/26)
- email Paul for check
- 10 hours a week
Tracy
- Add weekly progress report
- Add/create time logs
- General schedule due Thurs (1/24)
- investigate JMetric and create its SRS with Feasibility and Difficulty (1/24)
- Create tickets and learn for next meeting (1/24)
Richard
- Eclipse and create its SRS with Feasibility and Difficulty (1/24)
- Looking at feasible prototype - After drafted SRS
- 10 hours include lab
Ian
- Not here
- will email and ask why
- And create its SRS with Feasibility and Difficulty (1/24)
Paul
- investigate CheckStyle? and create its SRS with Feasibility and Difficulty (1/24)
- 10 hours include lab
- Look at other manual and get general idea - looked at extensions
- Look into manual layouts to get ideas for format (Sun)
- Check to see if wiki format can be converter to doc/pdf
Notes
- BlueJ and CheckStyle? conflict with errors - more in BLueJ
- Manual will be on wiki and then transfer to pdf
- Manual Format Tuesday 1/29
- In BlueJ Manual
- Came with docs
- Overview
- Features
- Download
- Pictures in how to install
- Requirements
- Installation
- Usage
- Settings
- user preference
- shared lab
- Contract
- Maybe
- Examples
- Tips and trick
- Update
- Include pictures
- Updated extension
- Contact
- Came with docs
Meeting Notes 1/17/08
Reminder
* Individual review due tonight at 8 pm
* Include average Hours a week
* Steph – name tags
* Make sure can access Trac account
* Fiddle around with eclipse other ide's for format
All
- Individual review due tonight at 8 pm
- Make sure can access Trac account
- Fiddle around with eclipse and other ide's for formatting coding
- Ideal Top Ten Risk - Tues
Steph
- Name Tags - Tues
- Will look into website - start/learn/update
- Add vision and Team expectations to web
Mark
- Create graphical Logo - Tues
- Will email to Steph asap
Tracy
- Talk to prof about emailing progress reports – due Fri at 5:00 pm
- Add/create time logs
- Type and look over general schedule
- Change user abilities in Trac
Richard
- Work with Ian to make a general protoype for Tues
Ian
- Work with Rickard to make a general protoype for Tues
Paul
- Look at other manual and get general idea
Notes
- Ideas for Prototype
- Need something that will take code and format
- look at eclipse style coding
- need tab size
- Idea change Checkstyle to change at end
- add methods instead of printing error comment
- Need something that will take code and format
- Went over general schedule
- Came up with Team expectations and vision – on website -Steph
- Will go over feasible prototype on Tues 1/22
- Web general/basic training on Thurs 1/24