Productivity Metrics (Size and Cost) CPE 309
Hours of Effort
Individual Planned: 11 hours
Team Planned: 66 Hours
Stage 0.1
Name Week 1 Total Aleks 4.5 4.5 Brad 2.5 2.5 Jared 5.5 5.5 Jason 3.75 3.75 Scott 2.25 2.25 Will 9.75 9.75 Team Total 28.25 28.25 % to Planned 42.8% 42.8%
Stage 1.0
Name Week 2 Week 3 Week 4 Total Aleks 2.75 9.25 13 25 Brad 5 2.5 10 17.5 Jared 6 6 4 16 Jason 6.5 7 9.75 23.25 Scott 7 7 8.25 22.25 Will 5.25 9 12.25 26.5 Team Total 32.5 40.75 57.25 130.5 % to Planned 49.2% 61.7% 86.7% 65.9%
Stage 2.0
Name Week 5 Week 6 Week 7 Week 8 Week 9 Total Aleks 6.5 7.5 7.5 10.5 28.25 60.25 Brad 3.75 14.5 8.5 18.25 9 54 Jared 5 5.75 10.5 3 13.5 37.75 Jason 4 7 6.75 9 27 53.75 Scott 7 3.5 16.5 6 12.75 45.75 Will 0.5 12.5 13 11.5 15.25 52.75 Team Total 26.75 50.75 62.75 58.25 105.75 304.25 % to Planned 40.5% 76.9% 95.1% 88.3% 160.2% 92.2%
Total
- Team Total: 434.75
- % Planned: 73.2%
Lines of Code
| Name | Stage 0.1 LOC | Stage 1 LOC | Stage 2 LOC | Removed | Total LOC |
| Aleks | N/A | 3 | 68 | N/A | 71 |
| Brad | N/A | 617 | 1162 | N/A | 1779 |
| Jared | N/A | 1 | 26 | N/A | 27 |
| Jason | N/A | 2 | 203 | N/A | 204 |
| Scott | N/A | 191 | 150 | N/A | 341 |
| Will | N/A | 1 | 343 | N/A | 344 |
| Team Total | 189 | 815 | 1952 | 264 | 2692 |
Stage 2.0
- Planned: 1995 LOC
- Actual: 2692 LOC
Stage 1.0
- Planned: 590 LOC
- Actual: 815 LOC
Stage 0.1
- Actual on 4/5/08: 189 LOC
Test Defects
Stage 2.0
- #200
- #259
- #260
- #252
- #254
- #256
- #253
- #258
- #261
- #255
- #257
- #262
- #264
- #263
- #265
- #266
- #268
Stage 1.0
- #192
- #145
- #147
Stage 0.1
- #104
- #50
- Undo button is not grayed out when BlueJ starts
- #92
Defects Per KLOC
Stage 2.0
- 8.92
Stage 1.0
- 9.82
Total Defect Repair Time
- 28 hrs.
Change Metrics
Number of Formal Change Proposals Submitted
- 12
Number of Formal Change Proposals Accepted
- 12
Number of Uncontrolled changes to SRS
- 0
Number of Uncontrolled changes to High Level Design (javadocs)
- 0